• icon+90(533) 652 66 86
  • iconnwsa.akademi@hotmail.com
  • icon Fırat Akademi Samsun-Türkiye

Article Details

  • Article Code : FIRAT-AKADEMI-2167-4006
  • Article Type : Araştırma Makalesi
  • Publication Number : 1A0407
  • Page Number : 128-136
  • Doi : 10.12739/NWSA.2018.13.2.1A0407
  • Abstract Reading : 620
  • Download : 175
  • Share :

  • PDF Download

Issue Details

  • Year : 2018
  • Volume : 13
  • Issue : 2
  • Number of Articles Published : 6
  • Published Date : 1.04.2018

Cover Download Context Page Download
Engineering Sciences

Serial Number : 1A
ISSN No. : 1308-7231
Release Interval (in a Year) : 4 Issues

Tayfun DEDE 1

Keywords

DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS

Tayfun DEDE 1

It is desirable that the construction projects can be completed in the most appropriate manner at the desired time, cost or other purposes. If any of these requests are solely aimed, the appropriate project parameters can be determined and the results such as the optimal time or cost can be determined after an optimization process. If more than one goal is to be achieved at the same time, the decision making process becomes more difficult. In this case, rather than a single final result, multiple results can be obtained. A number of techniques are used to optimize both time and cost. In this study, the techniques proposed for this purpose in the literature have been examined and some of these techniques have been applied to the construction projects considered as time-cost problem. Also, the TLBO algorithm, popular in recent years, has been the preferred in the solution of the multi-objective optimization problem. Construction project business activities which are taken into account as a time-cost problem in the literature are examined as numerical examples. A computer program is developed to realize the time-cost trade-off problem by using MATLAB.

Keywords
Optimization, Construction Project, Decision-Making, Construction, MATLAB,

Details
   

Authors

Tayfun DEDE (1) (Corresponding Author)

Karadeniz Teknik Üniversitesi
tayfundede@gmail.com | 0000-0001-9672-2232

Supporting Institution

:

Project Number

:

Thanks

:
References
[1] Bromilow, F.J., (1969). Contract Time Performance Expectation and the Reality. Building Forum, 1(3):70-80.