• icon+90(533) 652 66 86
  • iconnwsa.akademi@hotmail.com
  • icon Fırat Akademi Samsun-Türkiye

Article Details

  • Article Code : NWSA-4101-2216
  • Article Type : Araştırma Makalesi
  • Publication Number : 1A0163
  • Page Number : 415-420
  • Doi : 10.12739/
  • Abstract Reading : 1232
  • Download : 148
  • Share :

  • PDF Download

Issue Details

  • Year : 2011
  • Volume : 6
  • Issue : 1
  • Number of Articles Published : 49
  • Published Date : 1.01.2011

Cover Download Context Page Download
Engineering Sciences

Serial Number : 1A
ISSN No. : 1308-7231
Release Interval (in a Year) : 4 Issues

ERKEN VE GEÇ CEZALI PERMÜTASYON AKIŞ TİPİ ÇİZELGELEME PROBLEMLERİNİN DAĞINIK ARAMA METASEZGİSELİ İLE ÇÖZÜMÜ

Serkan KAYA 1 , Ömer AKGÖBEK 2 , Orhan ENGİN 3

Akış tipi çizelgeleme probleminde, n adet birbirinden bağımsız iş, aynı sıra ile birbirinden farklı m adet makinede işlem görmektedir. Bu araştırmada, erken ve geç cezalı, ortak teslim tarihi olan permütasyon akış tipi çizelgeleme problemleri incelenmiştir. Erken ve geç cezalı permütasyon akış tipi çizelgeleme, NP-Zor problemler kapsamında yer almaktadır. Bu problemlerin çözümünde, yapay zekâ tekniklerinden olan dağınık arama metasezgiseli kullanılmıştır. Erken ve geç cezalı, ortak teslim tarihli permütasyon akış tipi kıyaslama problemi, önerilen dağınık arama metodu ile çözülmüştür.

Keywords
Erken ve Geç Cezalı, Permutasyon Akış Tipi, Dağınık Arama, Metasezgisel Yöntemler, Kıyaslama Problemleri,

SCATTER SEARCH METAHEURISTIC FOR SOLVING THE FLOW SHOP SCHEDULING WITH EARLINESS AND TARDINESS PENALTIES

Serkan KAYA 1 , Ömer AKGÖBEK 1 , Orhan ENGİN 1

In a permutation flow shop scheduling problem, n independent jobs have to be processed in the same order on m different machines. In this study, the permutation flow shop scheduling problem with earliness and tardiness penalties and common due date for jobs is considered. The permutation flow shop scheduling with earliness and tardiness penalties is known NP-hard problem. A scatter search which known a metaheuristic method is used to solve this permutation flow shop scheduling problem. A benchmark permutation flow shop scheduling with earliness and tardiness penalties and common due date problem is solved by proposed scatter search method.

Keywords
Earliness and Tardiness Penalties, Permutation Flow Shop, Scatter Search, Metaheuristic Methods, Benchmark Problems,

Details
   

Authors

Serkan KAYA (1) (Corresponding Author)

Harran Üniversitesi
serkankaya@harran.edu.tr

Ömer AKGÖBEK (2)

Zirve Üniversitesi
omer_serhat@hotmail.com

Orhan ENGİN (3)

Selcuk University
orhanengin@yahoo.com

Supporting Institution

:

Project Number

:

Thanks

:
References